Sunday, 21 August 2022

Hunter River Bridge - a bit more work

Just a quick update post on my long running Hunter River rail bridge. In my most recent post on this project at the end of March, I said that I was wrestling with the challenge of how to get a sandstone block finish on the piers and abutments. Eventually, I located a paper product called Art Printers Dressed Stone Building Papers from Modeller's Warehouse. 

The finish looks great but is very delicate. Don't use masking tape to hold it in position. The building papers are supposedly a self adhesive product and it does stick to itself but it is less successful adhering to the foam that was used to construct the abutments and piers. It was a fiddly job particularly working around the curved surfaces and it was necessary to use PVA glue in some instances when the self adhesive failed. White exposed edges were painted with acrylics.

I then used weathering powders in an attempt to represent the aged stone of the prototype. Although it looks OK, it is a much redder than I had hoped. But it is what it is. 

I fitted the three 'steel' trusses with the assistance of a three foot spirit level and then fixed a piece of timber underneath to stiffen the structure until the bridge is installed. (thanks for the suggestion Rob). Once the backdrop has been installed, the bridge will be dropped into position and the track re-laid. Scenery will happen in due course but other areas will take priority.