The main justification for the short Mount Windeatt branch line on Philip's Creek is the Parker Brothers Saw Mill and its supply of sleepers for NSWGR as well as timber products to other markets.
As a consequence, the release of InFront's 18ft sleeper wagon caught my attention, and I lashed out and purchased ONE at the Thornleigh exhibition some weeks ago. My intention was to construct this one as a test and then purchase a few more when finances permitted. Unfortunately, the latest version of InFront's website advises that the wagon is now out of stock. Nice plan - fail!
It's a great kit with some fine detail. I thought the instructions included in the kit were basic but the manufacturer's website included additional photos that provided a useful supplement. Unfortunately, now that the model has been 'sold out', these photos have disappeared.
While the assembly of the kit was uncomplicated, I wasn't prepared for the partial disintegration of the Austrains chassis. It seems that everything on the chassis was a press fit and, progressively, both buffer beams came off, closely followed by the brake cables coming adrift. A bit of superglue fixed the problem but getting things back together required younger eyes and more dexterous fingers than my clumsy digits.If I was building another kit, pre-emptive gluing of the chassis components would be a requirement.
I also wasn't that happy with the decals when they were applied but I suspect that it had more to do with my technique than the product as supplied.
The colour photo on the website inspired me to be fairly generous with the rust colourings as part of the weathering. I understand that the wagons had a fairly hard life. However, it's also clear from the photo of the sleeper load that I have more work to do on the timber.
All in all, a nice addition to Philip's Creek!
Wednesday, 24 July 2013
Tuesday, 9 July 2013
Going Wireless
| The Mt Windeatt section of the layout in 2009 in England |
As it is currently constructed, Philip's Creek almost fills a single car garage, around 5.5m x 1.8m with several aisles to facilitate access. I bought a longer cable but was warned that its length (3m) was about the maximum before electrical losses would impact on the efficiency of the system. While it did allow greater reach, areas of the layout, particularly the two staging areas, were still well beyond the reach of the tethered controller.
| The antenna can be seen in the middle of the window |
With ambitions of further extensions and the prospect of retirement potentially providing time to achieve these ambitions, it was time to resolve the problem. The declining Aussie dollar added a further imperative. Some research on the internet and a couple of chats at the Modelling the Railways of NSW Convention at Loftus indicated that the best solution for me was a wireless arrangement and an additional cab controller.
Installation was fairly simple, apart from me putting one of the batteries around the wrong way in the supplementary controller. Otherwise, it was very much a 'plug and play' arrangement and. I can now use a controller at any point of the layout.
The supplementary cab is very basic and easy to use. However, I have noticed a delay between when a locomotive has been selected and it is ready to operate. In reality, the pause is probably no more than a second or two but in this day and age, it seems like a very long time. There was one instance when it took three attempts to select a locomotive. I'm still learning and I don't know if that is normal.
As I mentioned earlier, this purchase is an 'enabler' that will facilitate the the expansion plans, so roll on retirement! Maybe then, I'll also get around to covering the white styrofoam with a fascia.
Saturday, 15 June 2013
Crossing the Tracks
It has been a busy few months on the work front and this has
limited the time available for modelling activities. With retirement looming,
it seems as if my ‘working self’ is making sure there is one final bout of frantic
activity before being consigned to history. However, the recent Queen’s
Birthday long weekend did offer some respite, at least for two of the three
days.
On the Saturday, I took the opportunity to visit the Epping
Model Railway Exhibition at Thornleigh. It was another great exhibition from
that club with a number of layouts that I had not seen previously. There were
some very impressive layouts showcasing a very high standard of modelling. Congratulations to the organisers.
Suitably inspired, on Sunday, I felt motivated to tackle a few well
overdue tasks on Philip’s Creek. I finally managed to finish the fence
separating the village from the railway easement (http://philipscreek.blogspot.com.au/2012/11/a-waste-of-time.html). Then, it was time to tackle
a job that had been hanging around ever since the scenery was laid on the first
sections of the layout; the gap between the two original modules.
Previously, I had tried to mask the gap by locating the pub
and road on either side of the gap in the hope that, visually, it would be overwhelmed by
other detail. I suppose that idea worked in part, because something else always
seemed to have a higher priority.
Anyway, filling the gap was not difficult, and I then started
to cover the work with basic scenery, knowing that some day it may have to be
broken up if the modules are separated. For the area between the tracks, I
planned a mix of gravel, dirt and grass. However, after laying the ‘dirt’, I
suddenly realised that I had created a path between the fettler’s shed and the
Royal Hotel. The fettlers were ecstatic. Not only did they have a shortcut to
bring in tools and equipment but they now had a quick and direct access to the pub for
lunch each day.
So instead of looking for an appropriate scatter material, I
went searching for one of the Laser
Rail Bits timber level crossing kits that I had purchased a few months ago. One kit
had sufficient pieces to allow me to create a pedestrian crossing point across
three tracks. This very simple accessory was laid easily and all that was left to do was weather boards
and build up the footpath level.
However, it has created a nice little feature that, to be truthful, I hadn't visualised previously and all because of a bit of motivation from the Epping Model Railway Club - thanks gents.
Tuesday, 21 May 2013
Resurrection and Staying Alive
| CPH 16 back at Mount Windeatt |
In February 2012, I mentioned that the CPH had been withdrawn from service. It had never run well and I was not satisfied with the electrical pick up arrangements. At the time, I contemplated the purchase a new chassis and motor but other priorities intervened, as they do, and so the CPH just sat in the staging area.
Over the intervening 15 months, I have read a number of blog posts and articles about 'Stay Alive' or 'Keep Alive' capacitors being used as a way to overcome short term losses of power. From what I read, this seemed like a solution for my 30 Class tank locomotive and, to a lesser extent, my 50 Class. Despite having some additional pick-ups fitted, both still stall in particular locations on the Atlas points that I purchased back in the late 1990s.Yes, I could replace the points but that will be a major task probably causing a significant amount of damage to finished scenery. Hence attention has turned to the concept of the uninterrupted power supply.
| The 'Stay Alive' is the blue object on the left |
Clearly when it comes to 'stay alives', size does matter!
Tuesday, 26 March 2013
Evolution or a Lack of Planning?
One of the non railway projects that I have been undertaking over the past few weeks is to digitise a number of old family VHS from the mid 90s. It was certainly a trip down memory lane, and one of the segments that I uncovered was some video that I had taken of Philip's Creek in its earliest iteration in our garage in Missouri.
It highlighted how much Philip's Creek has evolved since 1996 reflecting changes in space availability and operations. For example, when the original video was taken, Philip's Creek was a continuous layout; it is now a point of point operation. Then, it occupied a space of 3.6m x 1.8m. Now it is 1.8m longer and is now a 'L+' shape. It has also moved from the original DC control to DCC.
However, some things haven't changed. The modular arrangement has withstood the test of time and many moves. The concept of a complete styrofoam base has made it light enough to move, but has also proved to be very stable. The prototype and time era has not changed although as I mentioned a while ago, an element of elasticity has crept into the time period.
To illustrate the changes, I have attached three photos, all of which show the same location on the layout but each separated by about 8 to 9 years. The first photo shows one section of the layout as it was originally constructed at the end of 1996 as part of the continuous track plan. The second photo shows the same area as it was around 2005. The section of through track had now become the coal mine siding. Finally, the third photo show it in its current iteration as a locomotive siding.
While some changes have been possible because of extra space, some have been the result of changes in the way the layout is operated. I would like to say that these reflect an evolution of my modelling but when I look at the detailed planning done by others, combined with the time they commit to get it right, I'm not so sure. I know my own eagerness to get something running, and the reality is probably more a lack of planning, or perhaps, a lack of adherence to the plan on my part. The only thing I can say in my own defence is the old cliché about 'change being a constant' on the prototype and therefore, I am modelling that change - well at least, that's my story and I'm sticking to it!
It highlighted how much Philip's Creek has evolved since 1996 reflecting changes in space availability and operations. For example, when the original video was taken, Philip's Creek was a continuous layout; it is now a point of point operation. Then, it occupied a space of 3.6m x 1.8m. Now it is 1.8m longer and is now a 'L+' shape. It has also moved from the original DC control to DCC.
However, some things haven't changed. The modular arrangement has withstood the test of time and many moves. The concept of a complete styrofoam base has made it light enough to move, but has also proved to be very stable. The prototype and time era has not changed although as I mentioned a while ago, an element of elasticity has crept into the time period.
To illustrate the changes, I have attached three photos, all of which show the same location on the layout but each separated by about 8 to 9 years. The first photo shows one section of the layout as it was originally constructed at the end of 1996 as part of the continuous track plan. The second photo shows the same area as it was around 2005. The section of through track had now become the coal mine siding. Finally, the third photo show it in its current iteration as a locomotive siding.
![]() |
| Philip's Creek 1996 |
| Philip's Creek 2013 |
| Philip's Creek 2005 |
Sunday, 10 March 2013
A Change of Scale Weekend
This weekend saw a focus on 1:1 scale locomotives rather than the usual 1:87 version. This is just a quick post with a few photos that may be of interest.
Yesterday, my wife and I took a trip from Sydney to Wollongong hauled by 3642 looking resplendent in its green livery. It was a great trip with a interesting return journey by sea but I have to acknowledge that there was considerably more vertical and lateral movement on the return journey. Fortunately, my lunch stayed where it should for that trip.
This morning, we also heard the unmistakable whistle of a steam locomotive around Hornsby where we live. A quick check of the internet indicated that 3016, normally resident in Canberra, was operating in the area. So this afternoon, there was a quick trip to a nearby overpass to capture a few photos capture 3016 as it returned to Central.
A 36 class is already part of the Philip's Creek roster but a 30T remains on the wish list.
Yesterday, my wife and I took a trip from Sydney to Wollongong hauled by 3642 looking resplendent in its green livery. It was a great trip with a interesting return journey by sea but I have to acknowledge that there was considerably more vertical and lateral movement on the return journey. Fortunately, my lunch stayed where it should for that trip.
This morning, we also heard the unmistakable whistle of a steam locomotive around Hornsby where we live. A quick check of the internet indicated that 3016, normally resident in Canberra, was operating in the area. So this afternoon, there was a quick trip to a nearby overpass to capture a few photos capture 3016 as it returned to Central.
A 36 class is already part of the Philip's Creek roster but a 30T remains on the wish list.
Thursday, 7 February 2013
A New Lease of Life
From a modelling perspective, it's been been a fairly quiet month, as work and family activities have occupied my time and attention. However, I have managed to spend a few hours on the hobby, with the focus returning to the CCH fleet as well as upgrading my two old Powerline MHGs.
However, for this post, I wanted to spend a few moments on the development of the new coal train as a whole, and the extra lease of life that it seems to have given to my elderly 50 class locomotive. I already operate one coal train, pulled by 6018, that regularly passes through Philip's Creek to somewhere further up the Hunter Valley. This consists of a dozen larger BCH wagons assembled from kits quite a few years ago. The original intention was for this train to pick up coal from the mine at Philip's Creek, but the frequent derailments of the 60 class caused a rethink and the second coal train was born, this time based on the smaller, "quaint" CCH and LCH wagons. Yes, I know there are two BCH wagons in the photos but they may disappear as the four wheel fleet grows.
5131 was the first white metal kit that I tackled shortly after converting back to HO scale. It is a bit rough compared to its brass and factory manufactured colleagues but is a sentimental favourite. It has been re-engined once, as well as receiving much attention and attempts at fine tuning, albeit with only limited success. In times of frustration, I have even considered converting it to a static model.
I don't know if it's my imagination, but since being assigned to the new role 5131 seems to run a lot smoother and more reliably. I may have just invoked Murphy's Law and it could return to its old ways, but hopefully, 5131 will soldier on for the foreseeable future.
One other surprise addition to the coal train was the CHG brake van. Santa (aka Gen Y son) left it under the Christmas tree. I had contemplated purchasing one at Liverpool last year but opted for two MHG vans instead. Nor was it on the Christmas wish list, but a frantic call from son just before Christmas, having left things a bit late for internet shopping, provided an opportunity for a spot purchase from the local hobby shop.
And so to finish this post, I thought I would step back, literally, and provide a longer distance view of the coal train on approach to the mine.
I don't know if it's my imagination, but since being assigned to the new role 5131 seems to run a lot smoother and more reliably. I may have just invoked Murphy's Law and it could return to its old ways, but hopefully, 5131 will soldier on for the foreseeable future.
And so to finish this post, I thought I would step back, literally, and provide a longer distance view of the coal train on approach to the mine.
Subscribe to: