Monday, 9 February 2026

Mount Windeatt with a BAM

Progress on the scenic elements of the Mount Windeatt makeover has been slow as the recent hot weather has made work in the garage a bit challenging. That said, the topography has been finalised and the surface of the module now has a basic dirt cover. Some of the major buildings, the sawmill, office, water tower and station building have also been fixed into place. All of these buildings were recycled from the earlier iteration but one new building, an engine shed for the logging railway, has also been added. 

While I don't see the need for locomotive facilities beyond coal and water for the NSWGR station of Mount Windeatt, the stand alone logging railway would probably justify a bit more infrastructure to support its operation and so, with this in mind, I sought out a locomotive servicing facility. 

During my search, I stumbled across a company called Brilliant Aussie Models otherwise known as BAM ( https://www.ebay.com.au/str/thebamcollection ). Unlike many other current manufacturers, their models are produced on printed card. With memories of the LJ models, some of which are still in service on Philip's Creek, I was happy to give them a try. That said, their approach is different to the earlier LJ products in that they use a slightly lighter grade of card and recommend extensive stiffening of model components. This was not a problem for me as, over time, I had began to reinforce the LJ models anyway. While I first encountered the products on Ebay, the company provides a substantially greater range in its catalogues sent out with other supporting documentation.

Most of the company's more specific railway infrastructure products follow South Australian and Queensland prototypes but the residential and commercial models have a much broader appeal across all states. That said, the engine shed model that I chose was a Queensland design but this was for use on a private railway which probably would have grabbed designs and ideas from anywhere in Australia.

The company provide a significant number of electronic instruction documents which cover various aspects of the construction process. I have to confess that I skimmed these when they arrived and subsequently only referred to them a few times during the construction process.  What I found much more useful was the practice building (a small shed) that had been included in the kit. It allowed me to refresh some old skills.

The kit was not difficult to construct but I did not rush the process and so, probably took longer than others to complete the building. The workshop annex was not part of the kit and I fabricated it from styrene off-cuts. Other pieces of styrene and wire were added as window frames and sills, fascia, gutters and downpipes. I also fabricated the doors from styrene.

One of the advantages of the card buildings is that  painting of the major elements is not required and only minor details require attention. To finish the model, the building was weathered using a combination of pastels and airbrush.

 

 

Would I purchase more of these models - most definitely, just not right now! The immediate focus must be to finish the Mount Windeatt refurbishment. With the engine shed installed, it's time to get the ballasting done before the static grass, completion of the backdrop and other details. 

But at my pace, that's still a good few months of work yet!


 

No comments:

Post a Comment