Tuesday, 4 March 2025

A Bridge Too Far or Moving to the next job - Mount Windeatt

No, this is not a post about the failed parachute operation in 1944 although, hopefully, I will be visiting that location shortly as part of our current travels.

Since my final post for 2024, I have managed to get the northern end of Philip's Creek to a point where it could be considered to be 'substantially complete'. This area is dominated by the flour mill and to a lesser extent the G1a type goods shed. Beyond these, the line disappears into the upper staging yard representing Muswellbrook and locations further north. Conceptually, this is the second “industrial precinct” of Philip’s Creek (the first is the coal mine to the south of the town). The main structures in this area are the flour mill and goods shed. A fettlers' shed and weigh bridge can also be found here. These two photos show the view of the approach to Philip's Creek from the north.


With an enforced absence from the layout, it's time to start planning the next phase of the work. A few posts previously ( https://philipscreek.blogspot.com/2024/07/the-biological-clock-is-ticking.html ), I had outlined the projects that I'd like to complete to get the whole layout substantially complete in the next few years. I had hoped to start on the quarry module but the failure of a point at Mount Windeatt pushed me to focus on those modules next. For new readers, Mount Windeatt is a fictitious location serviced by a branch line and provides sleepers and sawn timber to Singleton and locations further south.

It's a bit scary to say but it has now been over four years since I posted this photo of the two bridges linking the branch lines, Kingston Plains on the upper level and Mount Windeatt on the lower level, to the layout. Both bridges span the access to the main operational areas. Over the past four years, the upper hinged bridge has worked very well. However, I can't say the same the lower level bridge, a lift out section. Aligning the curved portion of the layout track and the lift out section has been problematic, and frankly, inserting and lifting the bridge has become an operational 'pain in the butt'.  So, dissatisfaction with my access arrangement to these modules has convinced me to take a more radical approach to the refurbishment of Mount Windeatt rather than simply replacing the failed point and refreshing the scenery.

The intent is now to create a self contained 'shelf layout' with a direct access to the Singleton staging area. This means that trains for Mount Windeatt will no longer travel on the lower part of the main line. Instead, the trains will now emerge directly from the staging area onto the Mount Windeatt modules. These trains will still retain a place in the Philip's Creek operating sequence but without the challenge of installing and removing the bridge each time. It will be a total rebuilt with the station area and sawmill being reversed. The proposed changes are summarised in the two graphics below.

 

But before I can start this work, I need to return home and that's going to take a few weeks yet!

 

 

 


 

 

 

Sunday, 22 December 2024

It's that time of the year, again!

Christmas has come around again and this will be my final post for 2024. As the year rapidly draws to a close,  I'd like to take the opportunity to wish all readers a Merry Christmas and a very happy 2025 for you and your family.

In the last few months, I have received several 3D resin printed railway objects. Among these were  some British semaphore signals in 00 scale. While I don't have a use for these on Philip's Creek, I assembled one as an experiment. It went together well but is delicate. It is currently being used to control Santa's train.

 

Work on Philip's Creek has slowed as other obligations have demanded time although scenery work on the northern end of Philip's Creek station in the vicinity of the goods shed and flour mill continues. One of those other tasks was decorating for Christmas. While I was recovering the Christmas decorations from the crawl space in the garage roof, I realised that I had a view of Philip's Creek rarely seen. These few photos give an overall impression of the layout's upper level.









I mentioned earlier that I have recently received several 3D prints of railway and associated objects. Two of these were tractors, which, when assembled and painted became wagon loads. I continue to be impressed by the level of detail which can be included in these prints, although removing the numerous supports can, sometimes, put that detail at risk.

These two tractors were successfully assembled and passed through Philip's Creek en route to Muswellbrook. From there, one was transshipped to Kingston Plains requiring it to pass back through Phillips Creek again.